Hillcrest is under construction

3 stalwarts posted on a sunny Wednesday evening.

The Thang:

Extended hillcrest loop. Run down West Hillcrest, left towards Charmian, Follow Charmian around to East Hillcrest. Back up East Hillcrest to finish the loop. Repeat x3.

NMM:

When we arrived, the Richmond road repaving crew was already set and ready to roll. That left very little parking and space for the PAX to park. Swirly and I found enough parking and waited for any additional PAX. TSB arrived shortly after having walked up the hill from here house. She refuses to take a ride up the hill because its a two minute walk (cannot argue with her logic).

Road paving operations were underway, so we modified our route to minimize the time on East Hillcrest. It ended up being a good call as the pavement operations were both smelly and hot. Additionally the vehicles were spewing out there diesel exhaust. Made for a hard run…but we prevailed.

Next week we will find a new route so that we miss the repaving….

TYA out

Comments

One response to “Hillcrest is under construction”

  1. Swirly (F3 Corporate) Avatar
    Swirly (F3 Corporate)

    The Southern Belle – Respect !
    TYA – Respect !